Xizi Otis Elevator Manual Upd -

Tighten all power cord joints, motor power lines, and the braking resistor line in the control cabinet. Check the safety chain continuity. Step 2: Positioning and Initial Hoistway Signal Check

Once the hoistway limits, door operators, and safety circuits are verified, the system must learn the building's floor profiles. xizi otis elevator manual upd

Before initiating power to the control cabinet, complete a full visual inspection of the wiring harnesses, hoistway, and mechanical components. Step 1: Pre-Power Inspections Tighten all power cord joints, motor power lines,

To protect the system from unauthorized configuration changes, the manual includes a server password locking feature: . Tighten all power cord joints