Connect the port to your out-of-band management network. 4. Initial Software Setup & Booting 7250 IXR-X1 typically boots SR Linux from an internal SSD. 7250 IXR Hardware Documentation Hub
Connect a grounding cable to the designated grounding lug on the rear of the chassis to prevent electrical damage. nokia 7250 ixr x1 installation guide
The unit supports both front-to-back and back-to-front airflow options. Ensure the rack provides adequate ventilation for the selected airflow direction. Space: Standard 19-inch rack mounting space is required. 3. Physical Installation Steps Connect the port to your out-of-band management network
Before beginning the physical installation, ensure the following site requirements are met: nokia 7250 ixr x1 installation guide
Connect the port to your out-of-band management network. 4. Initial Software Setup & Booting 7250 IXR-X1 typically boots SR Linux from an internal SSD. 7250 IXR Hardware Documentation Hub
Connect a grounding cable to the designated grounding lug on the rear of the chassis to prevent electrical damage.
The unit supports both front-to-back and back-to-front airflow options. Ensure the rack provides adequate ventilation for the selected airflow direction. Space: Standard 19-inch rack mounting space is required. 3. Physical Installation Steps
Before beginning the physical installation, ensure the following site requirements are met: