: Fill the cabinet with up to 50 kg of high-purity salt tablets (NaCl). 3. System Programming and Commissioning
: Must be a flat, dry, and frost-free indoor area protected from direct heat sources.
: Secure the wastewater hose to the system's drain port with a hose clamp and lead it to your drain system. aqmos r2d272 installation verified
: Turn off the main water supply and drain the lines.
: Must be between 2.0 and 6.0 bar. If pressure exceeds 6 bar, a pressure reducer is mandatory. 2. Physical Installation Steps Follow these steps to physically connect the system: : Fill the cabinet with up to 50
: Tighten these connections hand-tight initially to allow for adjustment before final tightening.
Once connected, the electronic must be configured: : Secure the wastewater hose to the system's
Ensuring your is verified and functioning correctly is essential for maintaining a limescale-free home. This guide provides a comprehensive walkthrough for a successful setup of the water softener. 1. Site Preparation and Requirements